Abstract:
UNAM has faced a lot of challenges with previous IT systems that costs millions but never worked to its satisfaction. It was decided to migrate data to the latest verions of AdaptIT formerly known as ITS. The system should be totally functional by mid-year. In connection to the industrial action in the previous year, Matengu ensured management's full cooperation with both unions and students.